Port Hueneme, Calif. (July 25, 2023) Steelworker Second Class Cordelia Broussard (left), Builder Second Class Brian Slocum (second-to-left), Steelworker First Class Richard Rodriguez (Middle), Builder Third Class Tatum Hansen (second-to-right) , and Builder Constructionman Jozeah Phoutpannha (right) with Naval Mobile Construction Battalion (NMCB) Four, during the Construction Training Exercise (CTX) Quay Wall Pile Cap Project. NMCB 4 is implementing a robust construction skill training plan to prepare for a dynamic mission set throughout the US Indo-Pacific Command in support of Commander, 7th Fleet objectives. (U.S. Navy photo by Utilitesman 2nd Class Nettie Mae Manfull/Released)
| Date Taken: | 07.25.2023 |
| Date Posted: | 08.04.2023 19:16 |
| Photo ID: | 7949509 |
| VIRIN: | 230725-N-AV351-1004 |
| Resolution: | 3174x3663 |
| Size: | 1.34 MB |
| Location: | PORT HUENEME, CALIFORNIA, US |
| Web Views: | 51 |
| Downloads: | 5 |
This work, Waterfront Construction Companies CTX Quay Wall Pile Cap Project. [Image 6 of 6], by PO2 Nettie Manfull, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.