Engineers tie off a boat to the Flexifloat Pontoon so they can manuever it into position. Two pontoons hold a 30-foot section of the bridge.
| Date Taken: | 01.21.2008 |
| Date Posted: | 09.27.2011 19:43 |
| Photo ID: | 77661 |
| VIRIN: | 080121-A-5261P-104 |
| Resolution: | 2464x1632 |
| Size: | 326.37 KB |
| Location: | RAMADI, IQ |
| Web Views: | 202 |
| Downloads: | 33 |
This work, Engineers bridge the gap [Image 4 of 4], by SFC Raymond Piper, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.