Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Battery Energy Storage System Ribbon Cutting Ceremony [Image 4 of 8]

    Battery Energy Storage System Ribbon Cutting Ceremony

    MARINE CORPS BASE CAMP LEJEUNE, NC, UNITED STATES

    04.13.2023

    Photo by Lance Cpl. Loriann Dauscher 

    Marine Corps Installations East       

    U.S. Marine Corps Brig. Gen. Andrew M. Niebel, commanding general of Marine Corps Installations East-Marine Corps Base (MCIEAST-MCB) Camp Lejeune, gives remarks during the Battery Energy Storage System ribbon cutting ceremony on MCB Camp Lejeune, North Carolina, April 13, 2023. Duke Energy is hosting the largest battery system in North Carolina and will frequently be operated in conjunction with the adjacent solar facility located on base, therefore strengthening the overall reliability of the energy grid and supporting the transition to cleaner energy. (U.S. Marine Corps photo by Lance Cpl. Loriann Dauscher)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 04.13.2023
    Date Posted: 04.13.2023 16:16
    Photo ID: 7738773
    VIRIN: 230413-M-GV552-1071
    Resolution: 6158x4266
    Size: 15.06 MB
    Location: MARINE CORPS BASE CAMP LEJEUNE, NC, US

    Web Views: 83
    Downloads: 5

    PUBLIC DOMAIN