Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Runway Rebuild [Image 1 of 4]

    Runway Rebuild

    (UNDISCLOSED LOCATION)

    03.17.2023

    Photo by Staff Sgt. Kekoa Santiago 

    332d Air Expeditionary Wing

    U.S. Air Force Tech. Sgt. Tanner Vodicka and Senior Airman Edgar Barcenas-Zumaya, water and fuels systems maintenance Airmen from the 332d Expeditionary Civil Engineer Squadron, complete startup procedures for a CTL concrete saw at an undisclosed location in Southwest Asia March 17, 2023. The 332d ECES prepare equipment for a simulated air attack in which the airfield must be repaired within hours to reopen for flight operations. (U.S. Air Force photo by Staff Sgt. Kekoa Santiago)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 03.17.2023
    Date Posted: 04.05.2023 05:29
    Photo ID: 7718466
    VIRIN: 230317-F-CL353-2027
    Resolution: 5152x3680
    Size: 10.63 MB
    Location: (UNDISCLOSED LOCATION)

    Web Views: 34
    Downloads: 4

    PUBLIC DOMAIN