Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Onslow Beach Bridge Construction [Image 3 of 10]

    Onslow Beach Bridge Construction

    JACKSONVILLE, NC, UNITED STATES

    03.08.2023

    Photo by Cpl. Jennifer E. Reyes 

    Marine Corps Installations East       

    One of five 124-foot girders is placed on the new Onslow Beach Bridge currently under construction on Marine Corps Base Camp Lejeune, North Carolina, March 8, 2023. The five girders will be lifted into place, allowing for the removal of the work platform on the island side of the Atlantic Intracoastal Waterway. Due to damage from Hurricane Florence, the 70-year-old swing bridge at Onslow Beach is being replaced by a single leaf Bascule bridge (levered vertical platform) with a projected completion date in the spring of 2025. The bridge replacement is part of the overall Task Force Florence hurricane reconstruction project. (U.S. Marine Corps photo by Cpl. Jennifer E. Douds)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 03.08.2023
    Date Posted: 03.21.2023 10:16
    Photo ID: 7691404
    VIRIN: 230308-M-PK533-1015
    Resolution: 6241x4163
    Size: 10.2 MB
    Location: JACKSONVILLE, NC, US

    Web Views: 130
    Downloads: 5

    PUBLIC DOMAIN