Steel Worker 2nd Class Cody Oswald prepares split pipe for installation off the Coast of Kauai in June. (Photo by EAC Blair Mercado/UCT-2)
| Date Taken: | 06.15.2012 |
| Date Posted: | 10.19.2012 19:33 |
| Photo ID: | 758669 |
| VIRIN: | 120615-N-ZZ999-001 |
| Resolution: | 3840x2880 |
| Size: | 5.98 MB |
| Location: | KAUAI, HAWAII, US |
| Web Views: | 170 |
| Downloads: | 9 |
This work, Split pipe preparation [Image 7 of 7], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.