Kittery, ME (November 23, 2022) - Staging to support the construction of 27 monoliths, each weighing nearly 4000 tons, which will be the base for OICC Portsmouth Naval Shipyard’s new dry docks as part of P381.
| Date Taken: | 11.18.2022 |
| Date Posted: | 11.23.2022 13:13 |
| Photo ID: | 7526518 |
| VIRIN: | 221118-O-DT551-548 |
| Resolution: | 2995x2986 |
| Size: | 1.99 MB |
| Location: | KITTERY, MAINE, US |
| Web Views: | 569 |
| Downloads: | 10 |
This work, Multi-Mission Dry Dock #1 (P381) Pre-Cast Monolith Construction in Brewer, ME [Image 2 of 2], by Victoria Arel, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.