Melvin Pena-Rivera poses in the Preproduction & Development Branch, responsible for onboarding and developing comprehensive processes for new cable workloads. Alongside a variety of depot stakeholders, branch personnel conduct initial production runs, prototypes, and/or engineering design models, guiding the project through completed first article testing (FAT). Once the FAT is completed, the workload is transitioned to the appropriate SIS cable shop for final production through the program’s lifecycle.
Date Taken: | 09.14.2022 |
Date Posted: | 11.04.2022 15:40 |
Photo ID: | 7496849 |
VIRIN: | 220914-A-TB732-3012 |
Resolution: | 1920x1380 |
Size: | 852.55 KB |
Location: | US |
Web Views: | 22 |
Downloads: | 8 |
This work, Tobyhanna Team Perfects Production [Image 2 of 2], by Thomas Robbins, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.