Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Sustaining the force: updating Osan’s electrical grid [Image 5 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Sustaining the force: updating Osan’s electrical grid

    OSAN AIR BASE, SOUTH KOREA

    10.10.2022

    Photo by Staff Sgt. Dwane Young 

    51st Fighter Wing

    U.S. Air Force Staff Sgt. Brenden Kerwin, 51st Civil Engineering Squadron electrical systems journeyman displays his hands after performing maintenance to a switchgear and high-voltage circuit breakers in a substation at Osan Air Base, Republic of Korea, Oct. 10, 2022. Kerwin assisted the U.S. Air Force Civil Engineer Maintenance, Inspection and Repair Team (CEMIRT) who inspected and performed substation maintenance. (U.S. Air Force photo by Staff Sgt. Dwane R. Young)

    IMAGE INFO

    Date Taken: 10.10.2022
    Date Posted: 10.21.2022 04:01
    Photo ID: 7473482
    VIRIN: 221010-F-NX702-1011
    Resolution: 5236x3066
    Size: 4.97 MB
    Location: OSAN AIR BASE, KR

    Web Views: 39
    Downloads: 6

    PUBLIC DOMAIN