GULFPORT, Miss. (Sep. 29, 2022) Seabees assigned to Naval Mobile Construction Battalion (NMCB) 1, pour concrete at the Port of Gulfport. The concrete pour is to create a new signal tower pad enabling the Port of Gulfport and the local Coast Guard to be able to operate the port 24 hours a day. NMCB 1 is conducting an intense homeport training plan to expand their ability to execute construction, humanitarian assistance, and theater operations. (U.S. Navy photo by Mass Communication Specialist 1st Class Sean P. Rinner)
| Date Taken: | 09.29.2022 |
| Date Posted: | 10.10.2022 12:25 |
| Photo ID: | 7457064 |
| VIRIN: | 220929-N-RH019-0005 |
| Resolution: | 4673x3115 |
| Size: | 3.81 MB |
| Location: | US |
| Web Views: | 40 |
| Downloads: | 5 |
This work, Port of Gulfport Concrete Pour [Image 6 of 6], by PO1 Sean P Rinner, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.