Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Maintenance projects keep operations moving smoothly for Pittsburgh District [Image 4 of 20]

    Maintenance projects keep operations moving smoothly for Pittsburgh District

    PITTSBURGH, PA, UNITED STATES

    08.31.2022

    Photo by Michel Sauret    

    U.S. Army Corps of Engineers Pittsburgh District

    Dave Scranton, an electrician with the U.S. Army Corps of Engineers Medium Capacity Fleet, works on an electrical motor gear box for a project led by the Pittsburgh District at the Loyalhanna Lake dam in Saltsburg, Pennsylvania, Aug. 31, 2022. The fleet sent a small team to the dam to repair a gantry crane, a crest gate dogging device, and add a new jib crane motor and control system. (U.S. Army Corps of Engineers Pittsburgh District photo by Michel Sauret)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 08.31.2022
    Date Posted: 09.08.2022 08:54
    Photo ID: 7404636
    VIRIN: 220831-A-TI382-0190
    Resolution: 5416x3648
    Size: 6.3 MB
    Location: PITTSBURGH, PA, US

    Web Views: 11
    Downloads: 3

    PUBLIC DOMAIN