Kittery, ME (April 12, 2022) – Three 20,000 gallons per minute pumps increase the water surface elevation of the P-310 Superflood Basin to prepare for docking of the USS Cheyenne into Dry Dock #1. (U.S. Navy photo by Jim Cleveland/Released)
| Date Taken: | 04.12.2022 |
| Date Posted: | 08.24.2022 15:06 |
| Photo ID: | 7386382 |
| VIRIN: | 220412-N-LI217-013 |
| Resolution: | 3000x2400 |
| Size: | 1.73 MB |
| Location: | KITTERY, MAINE, US |
| Web Views: | 255 |
| Downloads: | 5 |
This work, Pumping Continues at P-310 Superflood Basin [Image 7 of 7], by LT Matthew Karny, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.