Groundwater is purged at the former Camp Breckinridge using a peristaltic pump while water quality measurements are collected using a Horiba U-51 flow through cell. The water level in the well is measured during purging to make sure the pumping rate is not faster than the well is being refilled from the aquifer. (Courtesy photo by William Clabaugh)
Date Taken: | 06.15.2022 |
Date Posted: | 06.22.2022 16:22 |
Photo ID: | 7284332 |
VIRIN: | 220615-A-A1409-002 |
Resolution: | 1409x1057 |
Size: | 810.88 KB |
Location: | CAMP BRECKINRIDGE, KENTUCKY, US |
Web Views: | 20 |
Downloads: | 5 |
This work, Environmental engineers monitor water quality through groundwater sampling [Image 2 of 2], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.