Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    MacArthur Lock opening after seasonal maintenance, extended repair [Image 5 of 5]

    MacArthur Lock opening after seasonal maintenance, extended repair

    SAULT STE. MARIE, MI, UNITED STATES

    06.18.2022

    Photo by William Dowell 

    U.S. Army Corps of Engineers, Detroit District

    Water begins flowing into MacArthur Lock as a U.S. Army Corps of Engineers crane removes the first stoplog. The Corps of Engineers removed the stoplogs and opened the MacArthur Lock today after seasonal maintenance and an extended repair.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 06.18.2022
    Date Posted: 06.19.2022 12:44
    Photo ID: 7280012
    VIRIN: 220618-A-DT641-0239
    Resolution: 6108x4084
    Size: 20.26 MB
    Location: SAULT STE. MARIE, MI, US
    Hometown: DETROIT, MI, US

    Web Views: 20
    Downloads: 1

    PUBLIC DOMAIN