Water begins flowing into MacArthur Lock as a U.S. Army Corps of Engineers crane removes the first stoplog. The Corps of Engineers removed the stoplogs and opened the MacArthur Lock today after seasonal maintenance and an extended repair.
| Date Taken: | 06.18.2022 |
| Date Posted: | 06.19.2022 12:44 |
| Photo ID: | 7280012 |
| VIRIN: | 220618-A-DT641-0239 |
| Resolution: | 6108x4084 |
| Size: | 20.26 MB |
| Location: | SAULT STE. MARIE, MICHIGAN, US |
| Hometown: | DETROIT, MICHIGAN, US |
| Web Views: | 29 |
| Downloads: | 1 |
This work, MacArthur Lock opening after seasonal maintenance, extended repair [Image 5 of 5], by William Dowell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.