Water begins flowing into MacArthur Lock as a U.S. Army Corps of Engineers crane removes the first stoplog. The Corps of Engineers removed the stoplogs and opened the MacArthur Lock today after seasonal maintenance and an extended repair.
Date Taken: | 06.18.2022 |
Date Posted: | 06.19.2022 12:44 |
Photo ID: | 7280012 |
VIRIN: | 220618-A-DT641-0239 |
Resolution: | 6108x4084 |
Size: | 20.26 MB |
Location: | SAULT STE. MARIE, MI, US |
Hometown: | DETROIT, MI, US |
Web Views: | 20 |
Downloads: | 1 |
This work, MacArthur Lock opening after seasonal maintenance, extended repair [Image 5 of 5], by William Dowell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT