Christopher Svendsen, Hydraulic Engineer, US Army Corps of Engineers, Omaha District, and others make their way to the Florence bedrock removal project on the Missouri River, May 18, 2022. The goal of the project is to excavate a minimum of 120,000 cubic yards of material, and restore adequate channel parameters for river boat traffic on the Missouri River. (U.S. Army Corps of Engineers Photo by Samuel Weldin)
| Date Taken: | 05.18.2022 |
| Date Posted: | 05.26.2022 12:49 |
| Photo ID: | 7224598 |
| VIRIN: | 220519-A-OK605-005 |
| Resolution: | 6720x4480 |
| Size: | 4.35 MB |
| Location: | NEBRASKA, US |
| Web Views: | 36 |
| Downloads: | 4 |
This work, USACE Omaha District's Florence Bedrock Removal Project on the Missouri River [Image 5 of 5], by Samuel Weldin, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.