Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    As excavation nears completion, project shifts to construction at Charleroi [Image 3 of 5]

    As excavation nears completion, project shifts to construction at Charleroi

    BELLE VERNON, PA, UNITED STATES

    04.05.2022

    Photo by Michel Sauret    

    U.S. Army Corps of Engineers Pittsburgh District

    Jason Kreminski, an electrician, runs cable trays in a control channel for a project managed by the U.S. Army Corps of Engineers Pittsburgh District at the Locks and Dam 4 near Charleroi on the Monongahela River in Belle Vernon, Pennsylvania, April 5, 2022. As the excavation and demolition phase nears completion, the project has transitioned to construction, which includes prepping the miter sill for concrete placement, running electrical, finishing the foundation for the bulkhead sill, pouring concrete, anchoring the river wall and more. The Charleroi project began in 2004. The federal government funds half of the project’s cost, while the other half is covered by navigation industry through taxes paid on diesel fuel. (U.S. Army Corps of Engineers Pittsburgh District photo by Michel Sauret)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 04.05.2022
    Date Posted: 04.15.2022 09:34
    Photo ID: 7145009
    VIRIN: 220405-A-TI382-0585
    Resolution: 6048x4024
    Size: 2.84 MB
    Location: BELLE VERNON, PA, US

    Web Views: 8
    Downloads: 2

    PUBLIC DOMAIN