(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    As excavation nears completion, project shifts to construction at Charleroi [Image 2 of 17]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    A construction or infrastructure worker in safety gear observes a large excavation site, likely a lock or dam structure undergoing major rehabilitation or repair work. The scene shows a drained lock chamber with exposed concrete walls, excavated earth, and construction equipment visible in the background. The setting appears to be along a river, with hills and residential areas visible in the distance.

    BELLE VERNON, PENNSYLVANIA, UNITED STATES

    04.05.2022

    Photo by Michel Sauret      

    U.S. Army Corps of Engineers Pittsburgh District

    Shawn Soltis, a field engineer with the U.S. Army Corps of Engineers Pittsburgh District, conducts his morning checks at Locks and Dam 4 near Charleroi on the Monongahela River in Belle Vernon, Pennsylvania, April 5, 2022. As the excavation and demolition phase nears completion, the project has transitioned to construction, which includes prepping the miter sill for concrete placement, running electrical, finishing the foundation for the bulkhead sill, pouring concrete, anchoring the river wall and more. The Charleroi project began in 2004. The federal government funds half of the project’s cost, while the other half is covered by navigation industry through taxes paid on diesel fuel. (U.S. Army Corps of Engineers Pittsburgh District photo by Michel Sauret)

    IMAGE INFO

    Date Taken: 04.05.2022
    Date Posted: 04.15.2022 09:27
    Photo ID: 7144970
    VIRIN: 220405-A-TI382-0030
    Resolution: 6048x4024
    Size: 2.36 MB
    Location: BELLE VERNON, PENNSYLVANIA, US

    Web Views: 33
    Downloads: 3

    PUBLIC DOMAIN