AIEA, Hawaii (April 6, 2022) Dustin Goto, a Naval Facilities Engineering Systems Command contractor, labels a water sample from a granular activated carbon system as part of an interagency-approved plan for long-term monitoring of drinking water. The U.S. Navy continues to work with federal, state and local organizations to support families and residents, conduct long-term monitoring of the Navy water system, and work toward remediating Red Hill Well and the surrounding area. For detailed information, go to: www.navy.mil/jointbasewater. (U.S. Navy photo by Mass Communication Specialist 2nd Class Mar’Queon A. D. Tramble)
Date Taken: | 04.06.2022 |
Date Posted: | 04.06.2022 21:36 |
Photo ID: | 7130787 |
VIRIN: | 220406-N-TO792-1043 |
Resolution: | 4880x3253 |
Size: | 1.59 MB |
Location: | AIEA, HAWAII, US |
Web Views: | 144 |
Downloads: | 3 |
This work, Red Hill GAC water sampling [Image 4 of 4], by PO1 Mar'Queon Tramble, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.