John Carlson, SEH senior electrical engineer, and Scott Baker, U.S. Army Corps of Engineers, St. Paul District Winona resident engineer, discuss the concrete cores required from the electrical trenches to the two new upstream miter anchorages at Lock and Dam 5A in Fountain City, Wisconsin.
Date Taken: | 01.06.2022 |
Date Posted: | 04.01.2022 15:58 |
Photo ID: | 7121028 |
VIRIN: | 220106-A-A1415-001 |
Resolution: | 4032x3024 |
Size: | 4.12 MB |
Location: | FOUNTAIN CITY, WISCONSIN, US |
Web Views: | 9 |
Downloads: | 4 |
This work, Construction ramps up for the Eastern Area Office [Image 3 of 3], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.