U.S. Air Force Airmen assigned to the 23rd Civil Engineer Squadron, Tyndall Air Force Base and members of a local power company test the voltage of a substation before performing maintenance during a power outage March 19, 2022, at Moody Air Force Base, Georgia. A high-voltage substation is a configuration of circuit breakers, switches and over protection equipment that safely transforms high-voltage electricity into a lower suitable voltage supply for Moody. (U.S. Air Force photo by Senior Airman Jasmine M. Barnes)
| Date Taken: | 03.19.2022 |
| Date Posted: | 03.25.2022 16:40 |
| Photo ID: | 7109620 |
| VIRIN: | 220319-F-CX880-1007 |
| Resolution: | 5101x3401 |
| Size: | 10.93 MB |
| Location: | MOODY AIR FORCE BASE, GEORGIA, US |
| Web Views: | 115 |
| Downloads: | 16 |
This work, Moody, Tyndall upgrades power grid [Image 4 of 4], by SSgt Jasmine Barnes, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.