An M1 Abrams is being prepared to have the track installed at the end of the assembly line.
| Date Taken: | 11.24.2021 |
| Date Posted: | 12.01.2021 07:50 |
| Photo ID: | 6958499 |
| VIRIN: | 211124-D-TH175-195 |
| Resolution: | 5184x3456 |
| Size: | 6.24 MB |
| Location: | LIMA, OHIO, US |
| Web Views: | 232 |
| Downloads: | 32 |
This work, Joint Systems Manufacturing Center-Lima [Image 10 of 10], by Brian Hahn, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.