Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Fiscal year '20-funded barracks project continues at Fort McCoy [Image 5 of 6]

    Fiscal year '20-funded barracks project continues at Fort McCoy

    Ongoing construction work is shown Oct. 14, 2021, in the 1600 block of the cantonment area at Fort McCoy, Wis., for a second transient-training troops barracks project on post. The second barracks $18.8 million barracks project was awarded to L.C. Black Constructors, which is the contractor building the first barracks building, according to the U.S. Army Corps of Engineers Resident Office at Fort McCoy. The new contract was awarded Sept. 29, 2020, and the notice to proceed was issued Oct. 28, 2020. The contract duration is scheduled for completion in 780 calendar days. Currently contract completion is scheduled for December 2022. The barracks is different than the traditional barracks located throughout the installation. This new building will be four stories and able to house 400 people in approximately 60,000 square feet. The building will be built with the latest in construction materials and include state-of-the-art physical security and energy-saving measures. The project also is part of the Fort McCoy master plan that looks at continuously upgrading the installation’s infrastructure to be prepared for the future. The Army Corps of Engineers is managing the project. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 10.14.2021
    Date Posted: 11.01.2021 10:24
    Photo ID: 6915391
    VIRIN: 211014-A-OK556-588
    Resolution: 4889x3259
    Size: 3.98 MB
    Location: FORT MCCOY, WI, US

    Web Views: 2
    Downloads: 2

    PUBLIC DOMAIN