Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    301 FW F-35 Program Integration Office makes beddown possible [Image 4 of 4]

    301 FW F-35 Program Integration Office makes beddown possible

    FORT WORTH, TX, UNITED STATES

    09.29.2021

    Photo by Staff Sgt. Nije Hightower 

    301st Fighter Wing

    Maj. Matthew Stongin, 301st Fighter Wing F-35 Program Integration Office director, explains the future placements of F-35A Lightning II aircraft facilities on the wing's flight line to Jeremy Roman, 301 FW Public Affairs operations chief at U.S. Naval Air Station Joint Reserve Base Fort Worth, Texas, Sept. 29, 2021. Stongin also explained how F-16 Fighting Falcon operations will continue as the wing phases in requirements such as operations, aircraft maintenance and flight simulator facilities in preparation for the F-35 arrival. (U.S Air Force photo by Staff Sgt. Nije Hightower)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 09.29.2021
    Date Posted: 10.05.2021 15:36
    Photo ID: 6874223
    VIRIN: 210929-F-RC356-180
    Resolution: 5408x3600
    Size: 8.93 MB
    Location: FORT WORTH, TX, US

    Web Views: 73
    Downloads: 8

    PUBLIC DOMAIN