Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Dewatering Charleroi marks turning point in major Monongahela construction, navigation project [Image 4 of 16]

    Dewatering Charleroi marks turning point in major Monongahela construction, navigation project

    PITTSBURGH, PA, UNITED STATES

    09.30.2021

    Photo by Michel Sauret    

    U.S. Army Corps of Engineers Pittsburgh District

    Multiple contractor fleets have been working for the U.S. Army Corps of Engineers Pittsburgh District on the construction project at Charleroi Locks and Dam on the lower Monongahela River in Pennsylvania, shown here Sept. 30, 2021. The Pittsburgh District recently finished building the new lock chamber walls and has emptied it of approximately 20 million gallons of water, a process called dewatering, to allow contractors to begin adding the mechanical inner works of the chamber. The new lock chamber is 84 feet wide by 720 feet long, which will allow a nine-barge tow to lock through in 25 minutes, something that would take more than two hours using the older, smaller lock chamber. (U.S. Army Corps of Engineers Pittsburgh District photo by Michel Sauret)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 09.30.2021
    Date Posted: 10.05.2021 14:24
    Photo ID: 6874140
    VIRIN: 210930-A-TI382-0155
    Resolution: 6011x3999
    Size: 6.41 MB
    Location: PITTSBURGH, PA, US

    Web Views: 38
    Downloads: 3

    PUBLIC DOMAIN