A “road work ahead” sign on the sidewalk ahead of Theisen Street near the Bolling Club at Joint Base Anacostia-Bolling, Sept 13, 2021. The makeover of the road and parking lot outside of the Bolling Club is only one part of the $2 million base-wide paving project. In the last year and half, infrastructure improvement and maintenance has been a priority for the 11th Civil Engineer Squadron. (U.S. Air Force photo by 2nd Lt. Brandon DeBlanc)
Date Taken: | 09.13.2021 |
Date Posted: | 10.07.2021 13:47 |
Photo ID: | 6862273 |
VIRIN: | 210913-F-OC897-1005 |
Resolution: | 6748x4912 |
Size: | 5.18 MB |
Location: | WASHINGTON, DISTRICT OF COLUMBIA, US |
Web Views: | 36 |
Downloads: | 2 |
This work, Civil engineers lead base-wide infrastructure improvements [Image 5 of 5], by 1st Lt. Brandon DeBlanc, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.