Construction operations are shown at a bridge area on Fort McCoy’s South J Street on Sept. 23, 2021, so a new bridge can built on the street. The street is closed from Aug. 23 through Oct. 29, 2021, from South 8th Avenue to South 9th Avenue for construction of a new bridge over Tarr Creek. Fort McCoy’s Directorate of Public Works is in charge of construction coordination. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
| Date Taken: | 09.23.2021 |
| Date Posted: | 09.30.2021 11:01 |
| Photo ID: | 6860394 |
| VIRIN: | 210923-A-OK556-255 |
| Resolution: | 5769x3845 |
| Size: | 4.29 MB |
| Location: | FORT MCCOY, WISCONSIN, US |
| Web Views: | 4 |
| Downloads: | 1 |
This work, Construction of new bridge continues at Fort McCoy [Image 20 of 20], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.