The Crab Bank Restoration project uses compatible material dredged from the Charleston Harbor Deepening Project. The project will add 32 acres to the historic shorebird habitat and is slated to complete in the next few months. (U.S. Army photo by Dennis Franklin)
Date Taken: | 09.15.2021 |
Date Posted: | 09.24.2021 13:18 |
Photo ID: | 6855674 |
VIRIN: | 210915-A-EX555-0153 |
Resolution: | 2736x1824 |
Size: | 2.8 MB |
Location: | CHARLESTON, SOUTH CAROLINA, US |
Web Views: | 13 |
Downloads: | 2 |
This work, Crab Bank restoration begins; project stresses public safety, by Dennis Franklin, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.