(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Fiscal year ‘19-funded barracks project closer to completion at Fort McCoy [Image 21 of 30]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    A large multi-story institutional building, likely a military barracks or government facility, is shown in an active construction/finishing phase. The building features a combination of dark brick and tan stucco exterior with multiple floors of uniform windows. The surrounding grounds are unfinished, with exposed dirt, temporary chain-link fencing, and construction materials visible.

    Construction of a new multi-million dollar transient troop training barracks is shown June 11, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barracks in September 2019. The planned completion date is currently August 2021. The planned barracks will be different than the traditional barracks that are located throughout the installation. This new building is four stories and be able to house 400 people in approximately 60,000 square feet. The project also is the first of eight new buildings planned for the entire 1600 block at Fort McCoy. The plan is to build three more barracks with the same specifications, three 20,000-square-foot brigade headquarters buildings, and one 160-room officer quarters. This is an Army Corps of Engineers-managed project. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

    IMAGE INFO

    Date Taken: 06.11.2021
    Date Posted: 06.28.2021 17:22
    Photo ID: 6712412
    VIRIN: 210611-A-OK556-6484
    Resolution: 5155x3409
    Size: 3.06 MB
    Location: FORT MCCOY, WISCONSIN, US

    Web Views: 14
    Downloads: 4

    PUBLIC DOMAIN