Matthew Streicher, materials handling work leader, removes a crate of parts from the Environmental Division warehouse at FRCE. The T64 and F404 engine parts are stored in the warehouse until they can be shipped in 35,000 pound lots for handling by GE Aviation.
Date Taken: | 04.22.2021 |
Date Posted: | 06.07.2021 14:51 |
Photo ID: | 6680288 |
VIRIN: | 210422-N-NJ685-001 |
Resolution: | 5568x3712 |
Size: | 4.79 MB |
Location: | CHERRY POINT, NORTH CAROLINA, US |
Web Views: | 19 |
Downloads: | 4 |
This work, GE parts reclamation program saves time, money for FRCE engine lines [Image 2 of 2], by Kimberly Koonce, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.