Airmen of the 75th Expeditionary Airlift Squadron transfer cargo and personnel aboard a C-130J Super Hercules from Camp Lemonnier, Djibouti, to a tactical forward operating base in East Africa, May 25, 2021. The 75th EAS supports Combined Joint Task Force - Horn of Africa (CJTF-HOA) with medical evacuations, disaster relief, humanitarian and airdrop operations. (U.S. Air Force photo by Tech. Sgt. Daniel Asselta)
| Date Taken: | 05.25.2021 |
| Date Posted: | 06.04.2021 15:34 |
| Photo ID: | 6677437 |
| VIRIN: | 210525-F-UN842-0331 |
| Resolution: | 6048x4024 |
| Size: | 7.99 MB |
| Location: | (UNDISCLOSED LOCATION) |
| Web Views: | 6 |
| Downloads: | 7 |
This work, 75th EAS Conducts Combat Airlift Mission in East Africa [Image 17 of 17], by TSgt Daniel Asselta, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.