Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Arlington conducts integrated training drills [Image 9 of 9]

    Arlington conducts integrated training drills

    210603-N-PC065-1061 ATLANTIC OCEAN (June 3, 2021) Chief Damage Controlman Robert Schrader, assigned to the San Antonio-class amphibious transport dock ship USS Arlington (LPD 24), trains Sailors on proper pipe plugging techniques during an integrated training drill aboard the Arlington, June 3, 2021. Arlington is underway in the Atlantic Ocean. (U.S. Navy photo by Mass Communication Specialist 2nd Class John D. Bellino/Released)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 06.03.2021
    Date Posted: 06.04.2021 13:21
    Photo ID: 6676991
    VIRIN: 210603-N-PC065-1061
    Resolution: 5730x3820
    Size: 435.17 KB
    Location: ATLANTIC OCEAN

    Web Views: 24
    Downloads: 3

    PUBLIC DOMAIN