Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    RIA Garrison supports installation readiness, improving quality of life for all [Image 3 of 3]

    RIA Garrison supports installation readiness, improving quality of life for all

    Department of Public Works contractors replace windows at the RIA Hydroelectric Power Plant and Dam at Building 160, March 10. The history of water power on Rock Island Arsenal goes back many years, but the most noticeable trace of it is seen at the hydroelectric dam and power plant located on Sylvan Slough, a backwater of the Mississippi River. The Rock Island Arsenal DPW preserves installation infrastructure and is a large part of garrison operations.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 03.10.2021
    Date Posted: 04.21.2021 11:16
    Photo ID: 6609347
    VIRIN: 210310-A-BG000-469
    Resolution: 1401x1989
    Size: 316.6 KB
    Location: IL, US

    Web Views: 18
    Downloads: 4

    PUBLIC DOMAIN