Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Makin Island Underway [Image 9 of 32]

    Makin Island Underway

    ARABIAN GULF

    03.15.2021

    Photo by Seaman Nadia Lund 

    USS Makin Island (LHD 8)

    210315-N-IV962-1003
    ARABIAN GULF (March 15, 2021) – U.S. Navy Gas Turbine System Technical (Mechanical) 2nd Class Jared Rodriguez, assigned to Assault Craft Unit 5, writes on the engineering plan log during landing craft, air cushion maintenance aboard the amphibious assault ship USS Makin Island (LHD 8). The Makin Island Amphibious Ready Group and the 15th Marine Expeditionary Unit are deployed to the U.S. 5th Fleet area of operations in support of naval operations to ensure maritime stability and security in the Central Region, connecting the Mediterranean and the Pacific through the western Indian Ocean and three strategic choke points.(U.S. Navy photo by Mass Communication Specialist Seaman Nadia Lund)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 03.15.2021
    Date Posted: 03.26.2021 03:17
    Photo ID: 6571457
    VIRIN: 210315-N-IV962-1003
    Resolution: 6720x4480
    Size: 872.42 KB
    Location: ARABIAN GULF

    Web Views: 25
    Downloads: 12

    PUBLIC DOMAIN