Richard Boyd, an electrical equipment repairer at Fleet Readiness Center East, takes an inventory of parts before preparing to assemble an H-53 tail skid actuator. In the past, a shortage of this actuator has been a readiness degrader for the H-53 fleet; however, FRCE has made great strides in reducing the number of high-priority accountable backorders for this component and others since late 2018.
Date Taken: | 02.23.2021 |
Date Posted: | 02.23.2021 14:03 |
Photo ID: | 6529924 |
VIRIN: | 210223-N-AC707-1001 |
Resolution: | 4819x3327 |
Size: | 2.97 MB |
Location: | CHERRY POINT, NC, US |
Web Views: | 27 |
Downloads: | 4 |
This work, FRCE makes huge gains in high-priority backorders, by Heather Wilburn, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT