Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo
    Tag: H53
    Type: image
    • H-53 Fleet Support Team bolsters Fleet readiness with new engine wash procedures

      Photo by Joseph Andes   |   Fleet Readiness Center East   |   12.11.2023

      Jordan Barnes, a senior engineer on the H-53 Fleet Support Team (FST) at Fleet Readiness Center East, demonstrates the use of a new airless foamer while filming a video training aid in support of updated engine wash procedures for the Marine Corps CH-53E Super Stallion helicopter. The new engine wash procedures and training developed by the H-53 FST are aimed at enhancing time on wing and......

    • New process helps improve results for H-53 fitting at FRCE

      Photo by Heather Wilburn   |   Fleet Readiness Center East   |   12.05.2023

      A team of artisans and engineers at Fleet Readiness Center East (FRCE) recently developed and refined a new procedure for checking an H-53 spar fitting’s mount feet for excessive gaps, improving the manner in which the aircraft’s spar fittings are evaluated for fit and resulting in a higher acceptance rate and faster turnaround times for the components. Team members included, from left,......

    • New process helps improve results for H-53 fitting at FRCE

      Photo by Heather Wilburn   |   Fleet Readiness Center East   |   12.05.2023

      Jason Gaskill, an H-53 airframe production support engineer with the Maintenance, Repair and Overhaul Engineering Production Line Support Division at Fleet Readiness Center East (FRCE), examines successive rounds of impressions left by pressure-sensitive film while checking contact surfaces on the mount feet of an H-53 spar fitting. The use of the pressure-sensitive film to identify high areas......

    • New process helps improve results for H-53 fitting at FRCE

      Photo by Heather Wilburn   |   Fleet Readiness Center East   |   12.05.2023

      Jason Gaskill, an H-53 airframe production support engineer with the Maintenance, Repair and Overhaul Engineering Production Line Support Division at Fleet Readiness Center East (FRCE), and Michael Wells, a sheet metal worker in the H-53 Aircraft Components Shop at FRCE, examine the impressions left by pressure-sensitive film while checking contact surfaces on the mount feet of an H-53 spar......

    • New process helps improve results for H-53 fitting at FRCE

      Photo by Heather Wilburn   |   Fleet Readiness Center East   |   12.05.2023

      Shevaun Jones, a sheet metal worker in the H-53 Aircraft Components Shop at Fleet Readiness Center East (FRCE), uses a feeler gauge to check for excessive gaps on the mount feet of an H-53 spar fitting. The gap check is one step in a new procedure developed and refined by a team of artisans and engineers at FRCE in order to improve the manner in which the aircraft’s spar fittings are......

    • New process helps improve results for H-53 fitting at FRCE

      Photo by Heather Wilburn   |   Fleet Readiness Center East   |   12.05.2023

      Michael Wells, a sheet metal worker in the H-53 Aircraft Components Shop at Fleet Readiness Center East (FRCE), prepares a plate used to check an H-53 spar fitting’s mount feet for excessive gaps. The plate is used as part of a procedure developed and refined by a team of artisans and engineers at FRCE in order to improve the manner in which the aircraft’s spar fittings are evaluated for......

    • FRCE supports fleet through Sikorsky H-53 partnership

      Photo by Heather Wilburn   |   Fleet Readiness Center East   |   11.02.2021

      Glenn Roberts, a pneudraulics mechanic in the Fleet Readiness Center East (FRCE) hydraulics shop, assembles an H-53 primary servo cylinder. The primary servo cylinder is one of the items FRCE repairs as part of its H-53 Public-Private Partnership with Sikorsky. This partnership is helping meet the fleet’s needs for critical parts for CH-53E Super Stallion and MH-53E Sea Dragon heavy-lift......

    • FRCE supports fleet through Sikorsky H-53 partnership

      Photo by Heather Wilburn   |   Fleet Readiness Center East   |   11.02.2021

      Clarence Hargett, a mechanical parts repairer in the Fleet Readiness Center East (FRCE) blade shop, replaces sections of the trim tab on an H-53 main rotor blade to prepare it for painting. The main rotor blade is one of the items FRCE repairs as part of its H-53 Public-Private Partnership with Sikorsky. This partnership is helping meet the fleet’s needs for critical parts for CH-53E Super......