The final touches on a 2.4 million dollar renovation are being completed on the base gym at Kingsley Field in Klamath Falls, Oregon January 13, 2021. The women’s bathroom recieved a much needed expansion and upgrade with the remodel. (U.S. Air National Guard photo by Senior Master Sgt. Jennifer Shirar)
| Date Taken: | 01.13.2020 |
| Date Posted: | 01.13.2021 16:52 |
| Photo ID: | 6480624 |
| VIRIN: | 210113-Z-NV612-1004 |
| Resolution: | 6048x4024 |
| Size: | 6.76 MB |
| Location: | KLAMATH FALLS, OREGON, US |
| Web Views: | 43 |
| Downloads: | 3 |
This work, Kingsley Field base gym renovation complete [Image 5 of 5], by SMSgt Jennifer Shirar, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.