Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Tobyhanna’s new test-engineering capabilities revive Volcano [Image 1 of 4]

    Tobyhanna’s new test-engineering capabilities revive Volcano

    TOBYHANNA ARMY DEPOT, PA, UNITED STATES

    11.09.2020

    Photo by Thomas Robbins 

    Tobyhanna Army Depot

    William Rumble, electronics technician, performs the post-repair conformal coating inspection and touch-up process on a Volcano CCA. Acrylated polyurethane conformal coating applied to each CCA contains a tracer that fluoresces brightly when exposed
    to ultraviolet (UV) light. This aides the overall inspection and touch-up process.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 11.09.2020
    Date Posted: 12.22.2020 15:12
    Photo ID: 6464530
    VIRIN: 201109-A-TB732-1013
    Resolution: 1920x1282
    Size: 1.2 MB
    Location: TOBYHANNA ARMY DEPOT, PA, US

    Web Views: 51
    Downloads: 3

    PUBLIC DOMAIN