Temporary Services (Code 990) working on the dry dock build for the USS Pasadena (SSN 752) while USS San Francisco (SSN 711) is still in dock.
| Date Taken: | 09.23.2020 |
| Date Posted: | 11.19.2020 07:11 |
| Photo ID: | 6428736 |
| VIRIN: | 200923-N-YO710-024 |
| Resolution: | 6486x4324 |
| Size: | 11.8 MB |
| Location: | PORTSMOUTH, VIRGINIA, US |
| Web Views: | 321 |
| Downloads: | 42 |
This work, Collaboration and Creativity Keeps Norfolk Naval Shipyard on Schedule with Dry Dock Build for USS Pasadena [Image 3 of 3], by Shelby West, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.