"I enjoy working on this project because dredging removes contaminated material from our waterways and is crucial to the revitalization of Buffalo's waterways." - Andrew Kist, USACE Buffalo student engineer and Quality Assurance Representative
| Date Taken: | 09.23.2020 |
| Date Posted: | 11.19.2020 13:49 |
| Photo ID: | 6427879 |
| VIRIN: | 200923-A-PG036-031 |
| Resolution: | 4016x5628 |
| Size: | 10.07 MB |
| Location: | US |
| Web Views: | 15 |
| Downloads: | 3 |
This work, Buffalo River dredging, Fall 2020 [Image 11 of 11], by Jess Levenson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.