A U.S. Air Force crew chief with the 9th Expeditionary Bomb Squadron checks the wind speed on the flightline as Airmen inspect a light on a gear handle during a Bomber Task Force deployment at Andersen Air Force Base, Guam, Nov. 12, 2020. The crew chief continuously took wind speed readings during the maintenance work to ensure the work could be completed safely. (U.S. Air Force photo by Staff Sgt. David Owsianka)
Date Taken: | 11.12.2020 |
Date Posted: | 11.13.2020 13:47 |
Photo ID: | 6422596 |
VIRIN: | 201112-F-CB366-1019 |
Resolution: | 2378x1528 |
Size: | 2.19 MB |
Location: | ANDERSEN AIR FORCE BASE, GU |
Web Views: | 14 |
Downloads: | 4 |
This work, 9th EBS maintainers ensure B-1’s are mission ready [Image 6 of 6], by SSgt David Owsianka, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT