(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Eroding bank at Lick Run has been restored [Image 1 of 3]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The image shows a channelized urban stream or creek running between two retaining walls made of segmental concrete block. The scene appears to be a recently completed or ongoing civil engineering/stormwater management project, with rocky streambed and riprap lining the banks. A brick building with chain-link fencing is visible on the right, and a road with a tractor-trailer is visible in the background.

    PITTSBURGH, PENNSYLVANIA, UNITED STATES

    10.20.2020

    Photo by Andrew Byrne 

    U.S. Army Corps of Engineers Pittsburgh District

    The U.S. Army Corps of Engineers Pittsburgh District, in partnership with Pleasant Hills Authority, hosted a ribbon-cutting ceremony on Oct. 21 to signify the completion of the Streambank Protection Project.

    IMAGE INFO

    Date Taken: 10.20.2020
    Date Posted: 10.28.2020 15:57
    Photo ID: 6405863
    VIRIN: 201020-A-XW512-0003
    Resolution: 5472x3648
    Size: 9.61 MB
    Location: PITTSBURGH, PENNSYLVANIA, US

    Web Views: 22
    Downloads: 6

    PUBLIC DOMAIN