A new 600-foot span bridge is now open on Binz-Engleman Road. Previously the road would close during heavy rains because of the low water crossing over Salado Creek.
Date Taken: | 07.24.2012 |
Date Posted: | 08.06.2012 12:13 |
Photo ID: | 640149 |
VIRIN: | 120724-O-UR169-988 |
Resolution: | 3246x1424 |
Size: | 1.21 MB |
Location: | SAN ANTONIO, TEXAS, US |
Web Views: | 23 |
Downloads: | 0 |
This work, 600-foot bridge complete on Binz-Engleman, low water crossing no longer an issue [Image 2 of 2], by Lori Newman, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.