After nearly a year, the runway renovation project at Fort Bliss, Texas is almost complete. The runway is not one large strip, rather it is divided into 25-foot panels. During the project, 52 of those panels were replaced, and contractors made more than 200 minor repairs to the remaining panels.
| Date Taken: | 10.01.2020 |
| Date Posted: | 10.14.2020 15:36 |
| Photo ID: | 6389882 |
| VIRIN: | 201001-A-QV384-1736 |
| Resolution: | 2368x1692 |
| Size: | 3.34 MB |
| Location: | EL PASO, TEXAS, US |
| Web Views: | 58 |
| Downloads: | 11 |
This work, Fort Bliss airfield runway renovated, extends usability by 20 years [Image 4 of 4], by Michelle Gordon, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.