200922-N-BR087-1020
TINIAN, Commonwealth of the Northern Mariana Islands (Sept. 22, 2020) Builder 2nd Class Eli Arwood, assigned to Underwater Construction Team (UCT) 2, marks a pier for inspection in Tinian, Commonwealth of the Northern Mariana Islands (CNMI). The Seabees of UCT 2 are conducting an inspection and bathymetric survey of Tinian’s harbor and surrounding waterfront facilities. The Underwater Construction Team provides a capability for construction, inspection, repair, and maintenance of ocean facilities in support of Naval and Marine Corps operations. (U.S. Navy photo by Mass Communication Specialist 2nd Class Cole C. Pielop)
| Date Taken: | 09.22.2020 |
| Date Posted: | 09.22.2020 00:25 |
| Photo ID: | 6357015 |
| VIRIN: | 200922-N-BR087-1020 |
| Resolution: | 3763x2688 |
| Size: | 970.01 KB |
| Location: | US |
| Web Views: | 39 |
| Downloads: | 6 |
This work, Underwater Construction Team 2 Prepares Pier For Inspection [Image 2 of 2], by CPO Cole Pielop, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.