Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Chief's Report signed for North Landing Bridge Replacement Study [Image 1 of 2]

    Chief's Report signed for North Landing Bridge Replacement Study

    North Landing Bridge, which spans the Atlantic Intracoastal Waterway on the border of Chesapeake and Virginia Beach, Virginia, handles more than 11,000 vehicles per day under normal conditions. Norfolk District, U.S. Army Corps of Engineers is set to begin the design process for a replacement. (U.S. Army photo/Patrick Bloodgood)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 06.21.2016
    Date Posted: 08.31.2020 12:52
    Photo ID: 6334662
    VIRIN: 160621-A-OI229-101
    Resolution: 5184x3456
    Size: 1.77 MB
    Location: VA, US

    Web Views: 18
    Downloads: 0

    PUBLIC DOMAIN