President and CEO of the Light Weight Purification System (LWPS), Primo L. Acernese (left) and Cpl. Jose Soto (right) with 8th Engineer Support Battalion turn on the system on Camp Lejeune, NC, July 25, 2012. The LWPS produces potable water from freshwater, brackish and saltwater, with flow rates to 2.5 Gal. per minute.
| Date Taken: | 07.25.2012 |
| Date Posted: | 07.26.2012 10:12 |
| Photo ID: | 632849 |
| VIRIN: | 120725-M-KS710-067 |
| Resolution: | 5616x3744 |
| Size: | 10.92 MB |
| Location: | CAMP LEJEUNE, NORTH CAROLINA, US |
| Web Views: | 70 |
| Downloads: | 4 |
This work, 8th ESB trains with LWPS's [Image 4 of 4], by Sgt Anthony Ortiz, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.