Wayne Daigle, 3D media project manager, left, Daryl Roy, 3D media owner, connect a pressure hose adapter to service a B-1B Lancer aircraft at Dyess Air Force Base, Texas, Aug. 3, 2020. Both of the contractors serviced an auxiliary power unit after completing training on a virtual reality system. (U.S. Air Force photo by Staff Sgt. David Owsianka)
Date Taken: | 08.03.2020 |
Date Posted: | 08.10.2020 16:29 |
Photo ID: | 6302662 |
VIRIN: | 200803-F-CB366-1057 |
Resolution: | 5401x3616 |
Size: | 2.42 MB |
Location: | DYESS AIR FORCE BASE, TX, US |
Web Views: | 15 |
Downloads: | 4 |
This work, Crew chiefs, contractors conduct virtual training [Image 7 of 7], by SSgt David Owsianka, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT