Part of the demolition project includes gutting the inside of each building first before stripping the exterior.
Date Taken: | 06.26.2020 |
Date Posted: | 06.26.2020 17:10 |
Photo ID: | 6254236 |
VIRIN: | 200626-A-QT978-0003 |
Resolution: | 6015x3802 |
Size: | 4.37 MB |
Location: | FORT KNOX, KENTUCKY, US |
Web Views: | 20 |
Downloads: | 1 |
This work, 502nd Bridge Company demolishes two buildings to make space for equipment [Image 3 of 3], by Eric Pilgrim, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.