Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    U.S. Navy Seabees with NMCB-5’s Detail Sasebo construct two pre-engineered buildings for Naval Beach Unit 7 [Image 1 of 5]

    U.S. Navy Seabees with NMCB-5’s Detail Sasebo construct two pre-engineered buildings for Naval Beach Unit 7

    SASEBO, AICHI, JAPAN

    06.11.2020

    Courtesy Photo

    Naval Mobile Construction Battalion 5

    200611-N-ZW591-1043 SASEBO, Japan (June 11, 2020) Builder 2nd Class Nicholas Gould, from Marshalltown, Iowa, uses a scarification machine to roughen the existing concrete prior to a concrete placement. U.S. Navy Seabees with Naval Mobile Construction Battalion (NMCB) 5’s Detail Sasebo are constructing two pre-engineered buildings for Naval Beach Unit 7 at Yokose, Japan. NMCB-5 is deployed across the Indo-Pacific region conducting high-quality construction to support U.S. and partner nations to strengthen partnerships, deter aggression, and enable expeditionary logistics and naval power projection. (U.S. Navy photo by Steelworker 2nd Class Douglas Dooley)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 06.11.2020
    Date Posted: 06.19.2020 23:56
    Photo ID: 6246921
    VIRIN: 200611-N-ZW591-1043
    Resolution: 1008x756
    Size: 209.4 KB
    Location: SASEBO, AICHI, JP

    Web Views: 30
    Downloads: 1

    PUBLIC DOMAIN