(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    El Centro Sector Border Barrier Project [Image 6 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    A yellow motor grader is actively grading and leveling a dirt road or construction surface. The machine's large rear tires and grading blade are visible pushing and smoothing loose soil and gravel. The scene depicts active road construction or maintenance work in a dry, rocky environment.

    EL CENTRO, CALIFORNIA, UNITED STATES

    06.04.2020

    Photo by Dave Palmer 

    U.S. Army Corps of Engineers, South Pacific Division

    U.S. Army Corps of Engineers South Pacific Border District contractor employees continue work on access roads for border barrier construction at the El Centro 2 project site near El Centro, California, June 4. These projects are being executed by USACE, as directed through the U.S. Army by the Secretary of Defense, in response to Department of Homeland Security’s request for assistance to help secure the United States southern border by blocking drug-smuggling corridors through the construction of roads and fences, and the installation of lighting under Section 284 of Title 10, U.S. Code. DoD and USACE are executing these projects in support of U.S. Customs and Border Protection.

    IMAGE INFO

    Date Taken: 06.04.2020
    Date Posted: 06.22.2020 12:42
    Photo ID: 6245745
    VIRIN: 200604-A-IE537-011
    Resolution: 5472x3648
    Size: 7.91 MB
    Location: EL CENTRO, CALIFORNIA, US

    Web Views: 48
    Downloads: 2

    PUBLIC DOMAIN